This hub points you to the guides that match where you are in the job, from material choice to install. Use them to understand the work, then call for a straight quote when you want a number.

ATX Granite King is a working countertop crew in Austin, Texas. We serve Austin and the I-35 corridor. These guides exist so a homeowner can see how slab selection, templating, fabrication, and installation fit together before anyone shows up with a template. You pick the actual slab off a real Austin slab floor. The stone comes from a direct importer slab floor in Austin with 299 lots on the floor. Then one crew templates, fabricates, and installs it, start to finish.

Materials we handle are granite, quartzite, engineered quartz, marble, dolomite, soapstone, porcelain slabs, and semi precious. The guides treat those materials as they actually behave, not as catalog language. Granite is a natural igneous stone that is hard and heat tolerant but porous enough to want sealing. Engineered quartz is made from ground stone and resin, is non porous, needs no sealing, and can be damaged by direct heat and by long UV exposure outdoors. Marble is calcium based and etches from acids like lemon and vinegar regardless of sealing. Quartzite is metamorphosed sandstone and is very hard, though some slabs sold as quartzite are softer and behave more like marble.

If the job is a rental or a flip, we work with a slab selection and fabrication partner for rental grade and flip grade stone, so a rental does not have to pay for a showpiece slab. Sink cutout and sink set are included in the fabrication work. The crew gives dates in writing with the quote. Posted service area is Austin, Pflugerville, Round Rock, Cedar Park, Leander, Georgetown, Hutto, Jarrell, Salado, Belton, Temple, Killeen, Harker Heights, and the corridor. Call (512) 297-7493 or email info@atxgraniteking.com for a straight quote. Reachable seven days a week.

Every page on this site

The index.

What A Countertop Job Is

A countertop job is not a product in a box. It is a sequence. First you choose a material family. Then you stand on a slab floor and pick the actual slab, not a sample chip. Then cabinets must be set, because the template follows the cabinets, not the drawing. Then the shop cuts the slab to that template, including the sink cutout. Then the crew returns, sets the pieces, seams them, and sets the sink. That is the job. ATX Granite King runs that sequence with one crew. The stone comes from a direct importer slab floor in Austin with 299 lots. Materials on that floor include granite, quartzite, engineered quartz, marble, dolomite, soapstone, porcelain slabs, and semi precious.

Granite is a natural igneous stone. It is generally hard and heat tolerant. It is also porous enough to want sealing, in most cases on a schedule you keep up with. Engineered quartz is ground stone and resin. It is non porous and needs no sealing. Direct heat can damage it. Long UV exposure outdoors can fade or degrade it, so it is a poor outdoor choice in most cases. Marble is calcium based. Acids like lemon and vinegar etch it whether you seal it or not. Quartzite is metamorphosed sandstone. True quartzite is very hard. Some slabs sold as quartzite are softer and behave more like marble. Dolomite, soapstone, porcelain slabs, and semi precious have their own limits.

The job also includes choices that are not the slab photo: edge profile, seam placement, overhang, splash, and sink type. Those show up at template. A rental or flip can skip the showpiece slab. We work with a slab selection and fabrication partner for rental grade and flip grade stone so a rental does not have to pay for a showpiece slab. The guides separate those paths so you do not read a marble care page when you needed a simple quartz layout for a duplex. Posted service area is Austin, Pflugerville, Round Rock, Cedar Park, Leander, Georgetown, Hutto, Jarrell, Salado, Belton, Temple, Killeen, Harker Heights, and the corridor.

How The Work Gets Done

You start on the slab floor in Austin. You walk the lots and pick the actual slab. Vein direction, pits, fissures, and color range are visible on the full piece in a way a three inch sample never shows. After you pick, cabinets have to be in their final position, level enough to template. The crew templates the tops, marks sink and cooktop locations, and notes overhangs and edge. That template is the cut list. Fabrication follows the template, not a sketch you emailed. Sink cutout and sink set are included in the fabrication work. The same crew that templated comes back to install.

Install is physical work in your kitchen. Pieces come in, get dry fit, get seamed, get set on the cabinets, and get supported at overhangs. The sink goes in as part of that work. Seams are real. Even a good seam is visible if you look. Bookmatched slabs still have a line. Out of square walls show up as a scribe or a gap you have to accept. Old houses along the corridor often have walls that are not square. The crew works to the cabinets and the walls that exist, not to a perfect rectangle on paper. If a slab has a natural fissure, it can be filled or placed away from a cut. It does not vanish.

The crew gives dates in writing with the quote. There is no same day promise and no next day promise on this page because those promises are how jobs get sloppy. Templating cannot happen until cabinets are set. Fabrication cannot start until the template is done and the slab is on hand. Install cannot happen until the shop has finished the pieces. If you change the sink after template, the cut is wrong. If you move an island after template, the pieces will not fit. The guides on templating and install go through those checkpoints so you do not treat the schedule like a wish. When you want a number, call for a straight quote at (512) 297-7493.

Tradeoffs The Guides Will Name

Every material has a downside. Granite needs sealer in most cases. If you skip sealer, oil and wine can darken the surface. Quartz skips sealer, which is easier day to day, but a hot pan can leave a mark, and Texas sun is still UV exposure over time. Marble etches under lemon, tomato, and vinegar. That etch is a dull spot, not dirt you wipe. Sealer does not stop it. Quartzite is often sold as the hard marble look. True quartzite is generally very hard. Some slabs labeled quartzite are not, and they etch and scratch more like marble. Look at the actual slab. The name on the tag is not a lab test.

Layout has tradeoffs too. A busy slab looks different on a small galley than on a long island. Seams on L shapes are normal. A long run with no seam needs a slab that is long enough and a path into the house that can take that piece. Stairs, tight doors, and second story condos change what can be carried. Porcelain slabs are large and thinner, which helps weight and hurts if the cabinets are not flat. Soapstone dents. Semi precious stone is usually a feature piece, not a full kitchen, unless you know what you are buying. Read the right guide before you pick a photo and assume the house will accept it.

Process tradeoffs are the ones people skip. You cannot template off unfinished, movable cabinets and expect the stone to fit later. You cannot hold a slab on a verbal hold while the remodel stalls. Lots on the floor move. The floor has 299 lots, which is a lot of stone, and still a specific slab can be sold. Rental grade and flip grade stone is the honest path when the kitchen is not the point of the house. Using a showpiece slab on a rental is how you overspend. Using dull stone in a house you cook in every day is how you get tired of the tops. The guides will say that.

What You Should Read First

If you have not chosen a material, read the granite, quartz, marble, and quartzite guides first, then dolomite, soapstone, porcelain, and semi precious if those are in play. Decide how you cook. If you cut citrus on the top and will not use a board, marble will mark. If you set hot pans down, quartz is the weaker choice and granite or true quartzite is generally stronger. If you want no sealer, quartz is the usual answer indoors. If the top is outdoors, quartz is usually the wrong answer because of UV. If the job is a rental, skip the showpiece path and read the rental grade notes. Decision order is use, then material, then actual slab, then layout.

If cabinets are already ordered or installed, read templating and fabrication next. Measure your access path. Note the sink model. Note the cooktop. Note whether the dishwasher is in, because that changes how the sink base sits. The template is only as good as the cabinets in front of the templater. If you are still changing island size, wait. If you already picked a slab photo online, stop and go to the Austin slab floor. Online photos are lit, wet, and cropped. The 299 lots on the floor are the real inventory. You pick the actual slab. That step decides color variation, seam strategy, and whether you have enough material for splash.

If you already know the stone and the layout, read install and care. Care is not optional reading for marble and unsealed granite. Quartz care is simpler and still not a cutting board. If you are a landlord, read the rental grade path and do not mix it with a marble etch guide. If you are remodeling one kitchen for yourself, read material then process. Keep a short list of questions. Bring the sink spec. Bring photos of the cabinets. Then call. The answer for a number is the same on every guide: call for a straight quote. Phone is (512) 297-7493. Email is info@atxgraniteking.com. Reachable seven days a week.

How To Start With This Crew

ATX Granite King is the crew that templates, fabricates, and installs, one crew start to finish. You pick the actual slab off a real Austin slab floor. Stone comes from a direct importer slab floor in Austin with 299 lots. We handle granite, quartzite, engineered quartz, marble, dolomite, soapstone, porcelain slabs, and semi precious. Sink cutout and sink set are included in the fabrication work. We work with a slab selection and fabrication partner for rental grade and flip grade stone so a rental does not have to pay for a showpiece slab. That is the whole offer. The guides on this hub are how you prepare so the first call is specific.

Call or email before you need a date tomorrow. Bring the address, the material family if you have one, and whether cabinets are in. If you already walked the floor, bring the lot tags. If you have not, say so and we point you at the floor. Service area is Austin, Pflugerville, Round Rock, Cedar Park, Leander, Georgetown, Hutto, Jarrell, Salado, Belton, Temple, Killeen, Harker Heights, and the I-35 corridor. If you are outside that posted area, say so on the call. The crew gives dates in writing with the quote. Do not plan a dinner party around a verbal window. For a number, call for a straight quote.

Phone is (512) 297-7493. Email is info@atxgraniteking.com. Reachable seven days a week. Use the guides to get your questions in a row. Use the floor to pick stone you have actually seen. Use the quote to lock dates in writing. That is how a working crew runs a job. We will not invent a timeline in days on this page. We will not talk around marble etch or quartz heat marks. If the honest answer is that your slab choice is a poor fit for how you live, the guides already said it, and the call will say it again. Read first, then call for a straight quote.

Flat, honest pricing

Priced by the square foot.

StandardKitchens, baths, bars
$38per sq ft
Over 1,000 sq ftBuilders, multifamily, whole-house
$30per sq ft

$38 per square foot, cut, measure, and install included. Jobs over 1,000 square feet: $30 per square foot.

Sink cutout and sink set are included in the fabrication work. Non standard work is still quoted before work begins. Send the rough square footage and the rooms involved, or call (512) 297-7493 for a straight quote.

Good to know

Questions, answered.

Do I need to read every guide before I call?

No. Read the material guides if you have not chosen stone. Read templating and install if cabinets are going in. Read the rental grade notes if the kitchen is a rental or a flip. The hub is there so you do not mix those paths. A call still needs an address, a sense of the layout, and whether cabinets are set. For a number, call for a straight quote. Phone (512) 297-7493 or email info@atxgraniteking.com, seven days a week.

Can I pick from a sample and skip the slab floor?

You can look at samples to narrow a color, but you pick the actual slab off the Austin floor. Samples hide movement, pits, and how a pattern dies out at the edge of a full slab. The floor has 299 lots. That is the inventory. One crew then templates, fabricates, and installs what you picked. If you skip the floor, you are buying a surprise. That is the honest downside. Call for a straight quote after you have seen stone, or call first and we will point you at the floor.

How long does a job take?

The crew gives dates in writing with the quote. This page will not name a number of days because cabinet delays, sink changes, and slab holds change the calendar. Templating waits on finished cabinet placement. Fabrication waits on the template and the slab. Install waits on finished pieces. Same day and next day work is not how this crew runs a clean job. If you need a date, call for a straight quote and get it in writing.

Is marble a bad idea in a kitchen?

Marble is calcium based and etches from acids like lemon and vinegar regardless of sealing. If you cook with citrus and wipe the juice on the top, you will see dull spots. Some people like that worn look. Many do not. Sealer helps staining. It does not stop etching. If you want a marble look with generally better hardness, look at true quartzite on the floor, and know that some slabs sold as quartzite are softer and behave more like marble. Stand in front of the slab. Then call for a straight quote.

Do you handle rental kitchens the same as a main house?

No. A rental does not have to pay for a showpiece slab. We work with a slab selection and fabrication partner for rental grade and flip grade stone. The sequence is still template, fabricate, install, and sink cutout and sink set are still in the fabrication work. The stone itself is a different grade. That is the point. Mixing a showpiece slab into a duplex kitchen is how the job gets out of scale. Read that guide first if you are a landlord. For a number, call for a straight quote.

Talk to the crew

Call for a straight quote.

Tell us the rooms, the rough square footage and what you have in mind for your kitchen or bath. You get a number for the whole job, in writing, before anyone cuts anything.