Walk the Austin slab floor to pick your stone, then one crew templates, fabricates, and installs. Sink cutout and set included.
Most Cedar Park kitchens built in the 1990s and 2000s came with laminate or tile countertops. When those surfaces wear out, homeowners want something that lasts and looks like it belongs in a house along the US 183 corridor today. ATX Granite King handles the whole job: tear out the old top, template the new one, fabricate it from the slab you picked, and install it with the sink cutout and set included.
The crew works with granite, quartzite, engineered quartz, marble, dolomite, soapstone, porcelain slabs, and semi-precious stone. If you want a rental-grade or flip-grade slab, they partner with a selection and fabrication shop so you don’t have to pay for a showpiece. Everything is done by the same team from start to finish, no handoffs.
This page explains what happens when you replace kitchen countertops in Cedar Park: how the old top comes out, what to do about backsplashes and cabinets, the order of work, and how to get started with a straight quote.
You pick the slab off a real Austin slab floor with 299 lots. The same crew that templates your kitchen fabricates the top and installs it. No subcontractors, no handoffs. Sink cutout and set are included in the work, so you don’t have to coordinate with a plumber separately.
Granite, quartzite, engineered quartz, marble, dolomite, soapstone, porcelain slabs, and semi-precious stone. For rental or flip projects, they work with a partner to source and fabricate lower-cost slabs so you don’t pay for premium material if you don’t need it.
The crew handles the sink cutout during fabrication and sets the sink during installation. No extra charge, no separate plumber needed. If you’re keeping your existing sink, they’ll template around it and reinstall it. If you’re upgrading, they’ll set the new one.
In Cedar Park, most kitchens from the 1990s and 2000s have laminate or tile countertops. Laminate is glued down to a particleboard or plywood substrate. The crew cuts the laminate into sections with a circular saw, then pries it up with a pry bar. The substrate usually comes up with it, but if it’s still solid, they’ll leave it in place for the new top to sit on. Tile is more work: the crew breaks it out with a chisel or demolition hammer, then grinds down the thinset mortar to get a flat surface for the new countertop.
If the old countertop was stone, the crew disconnects the sink and faucet first. Stone is heavy, so they cut it into sections with a diamond blade saw to make it easier to carry out. The substrate under stone is usually plywood, which they’ll inspect for water damage or rot. If it’s still solid, they’ll leave it; if not, they’ll replace it before installing the new top.
Backsplashes are usually attached to the countertop, not the wall. When the old top comes out, the backsplash usually comes with it. If you’re keeping the same backsplash material, the crew will reinstall it after the new countertop is in. If you’re replacing it, they’ll remove it completely and prep the wall for the new one. Some homeowners choose to leave the backsplash off until after the new countertop is installed, so they can see how the new top looks before deciding on a backsplash.
After the old countertop is out, the crew templates the new one. They use a laser level to mark the exact dimensions of your cabinets, then take a physical template with strips of luan plywood or a digital template with a laser scanner. The template includes the sink location, faucet holes, cooktop cutout, and any overhangs for seating. If you’re keeping your existing sink or cooktop, they’ll template around it to make sure the cutout fits.
The template is sent to the fabrication shop, where the slab you picked is cut to size. The edges are polished, and any cutouts for the sink, faucet, or cooktop are made. If you chose a stone that needs sealing, like granite or marble, the crew will seal it before installation. Engineered quartz doesn’t need sealing, but it can be damaged by direct heat, so the crew will warn you about placing hot pans on it.
Fabrication usually takes a few days, depending on the workload. The crew will give you a date in writing when they provide the quote. They don’t promise same-day or next-day fabrication, but they’ll keep you updated if there are delays. Once the top is ready, they’ll schedule the installation.
On installation day, the crew brings the new countertop in sections if it’s large. They set it on the cabinets and check for level. If the cabinets aren’t level, they’ll shim them to make sure the countertop sits flat. The top is secured with construction adhesive and screws through the substrate into the cabinet frames. For stone, they use silicone adhesive to prevent cracking from movement.
If you’re keeping your existing sink, the crew will reinstall it after the countertop is secured. If you’re upgrading to a new sink, they’ll set it in the cutout and connect the plumbing. The faucet is usually installed after the sink is set, unless it’s an undermount faucet that needs to be attached before the sink goes in. The crew will test the sink and faucet to make sure there are no leaks before they leave.
Cabinets usually don’t need to be replaced when you replace countertops, but they might need minor repairs. If the old countertop was heavy, like stone, the cabinet frames might have shifted or sagged. The crew will check for level and shim the cabinets if needed. If the cabinets are water-damaged from a leaky sink, they’ll let you know, but they don’t handle cabinet repairs or replacements. You’ll need to coordinate that separately.
Granite is a natural stone that’s hard and heat-tolerant, but it’s porous and needs sealing every few years. It’s a good choice for homeowners who want a unique, natural look and don’t mind the maintenance. Quartzite is even harder than granite and usually doesn’t need sealing, but some slabs sold as quartzite are softer and behave more like marble. Engineered quartz is non-porous and doesn’t need sealing, but it can be damaged by direct heat and long UV exposure, so it’s not ideal for outdoor kitchens.
Marble is calcium-based and etches from acids like lemon and vinegar, even if it’s sealed. It’s a good choice for homeowners who love the look of marble and don’t mind the maintenance. Dolomite is similar to marble but usually harder and less prone to etching. Soapstone is non-porous and doesn’t need sealing, but it’s softer than granite and can scratch or chip. Porcelain slabs are durable and heat-resistant, but they’re thinner than stone and can crack if not installed properly.
For rental or flip projects, the crew works with a partner to source and fabricate lower-cost slabs. These are usually granite or quartz, and they’re a good choice if you don’t need a premium slab. The crew will help you pick a slab that fits your budget and your project’s needs. They won’t upsell you on a showpiece slab if you don’t need it.
The first step is to call or email to schedule a slab selection appointment. You’ll walk the Austin slab floor with the crew and pick the stone you want. They’ll take measurements of your kitchen and give you a straight quote that includes tear out, fabrication, installation, sink cutout, and sink set. The quote will also include a date for installation in writing.
If you’re not sure what material you want, the crew will explain the tradeoffs and help you decide. They won’t push you toward a more expensive slab, but they’ll tell you if a material isn’t a good fit for your project. For example, if you have a rental property and want something low-maintenance, they’ll recommend engineered quartz or a sealed granite. If you’re flipping a house and want a high-end look, they’ll help you pick a slab that will appeal to buyers.
Once you have the quote, you can decide whether to move forward. There’s no pressure to commit, and the crew won’t ask for a deposit upfront. If you decide to proceed, they’ll schedule the tear out and installation. The whole process usually takes a few weeks from slab selection to installation, depending on the workload. The crew will keep you updated if there are any delays.
$38 per square foot, cut, measure, and install included. Jobs over 1,000 square feet: $30 per square foot.
Sink cutout and sink set are included in the fabrication work. Non standard work is still quoted before work begins. Send the rough square footage and the rooms involved, or call (512) 297-7493 for a straight quote.
Backsplashes are usually attached to the countertop, not the wall. When the old top comes out, the backsplash usually comes with it. If you’re keeping the same backsplash material, the crew will reinstall it after the new countertop is in. If you’re replacing it, they’ll remove it completely and prep the wall for the new one. Some homeowners choose to leave the backsplash off until after the new countertop is installed, so they can see how it looks before deciding.
In most cases, yes. Cabinets usually don’t need to be replaced when you replace countertops, but they might need minor repairs. If the old countertop was heavy, like stone, the cabinet frames might have shifted or sagged. The crew will check for level and shim the cabinets if needed. If the cabinets are water-damaged from a leaky sink, they’ll let you know, but they don’t handle cabinet repairs or replacements.
The crew gives dates in writing with the quote. The whole process usually takes a few weeks, depending on the workload. Slab selection and templating happen first, then fabrication, then installation. They don’t promise same-day or next-day anything, but they’ll keep you updated if there are delays.
Marble is calcium-based and etches from acids like lemon, vinegar, and some cleaners, even if it’s sealed. The etching shows up as dull spots or rings that can’t be polished out. Marble is also softer than granite or quartzite, so it can scratch or chip more easily. If you love the look of marble and don’t mind the maintenance, it’s a good choice, but it’s not as durable as other stones.
You don’t need to be home during the tear out, but you should be there for the template and installation. The crew needs access to your kitchen to take measurements and install the new countertop. If you can’t be home, you can arrange for someone else to let them in, but it’s best if you’re there to answer questions and make decisions on the spot.
Tell us the rooms, the rough square footage and what you have in mind for kitchen countertop replacement in cedar park. You get a number for the whole job, in writing, before anyone cuts anything.