Template And Measurement Day

Cabinets have to be installed and fastened before we arrive. We digital template the real run, measure the sink and cooktop on site, and lock seam and vein layout with you.

· Pick your own slab· Template, fabricate, install· Austin & the I-35 corridor

Template day is when ATX Granite King measures the cabinets you actually installed, not the ones on a drawing. The crew uses a digital templater, checks that the sink and cooktop are in the room, and walks seam and vein layout on the stone you already picked in Austin. Cabinets have to be set, fastened, and sitting at final height. If they are not, we leave and come back when they are. That is the whole gate.

You pick the slab off a real Austin slab floor first. Then this visit turns that slab into a cut path. Digital templating records walls, overhangs, inside corners, and hole locations. We need the real sink and the real cooktop because cutouts are not generic. Farm sinks, undermounts, and cooktops all change the file. Seam placement is a joint decision. Vein direction is a joint decision. We will tell you when a request fights the slab size or the cabinet line.

ATX Granite King serves Austin and the I-35 corridor with one crew start to finish. Materials handled are granite, quartzite, engineered quartz, marble, dolomite, soapstone, porcelain slabs, and semi precious. Sink cutout and sink set are included in the fabrication work. The crew gives dates in writing with the quote. If you need a number, call (512) 297-7493 for a straight quote. Email info@atxgraniteking.com. Reachable seven days a week.

What this comes down to

Cabinets Must Be Ready

Base cabinets have to be installed, leveled, and screwed down before we template. End panels and fillers that meet the stone have to be in. Walls should be in their final shape. If a cabinet is missing or sitting on shims you still plan to change, the digital file will be wrong. We will not guess a cabinet that is not there. Finish the boxes first.

Sink And Cooktop

Bring the actual sink and the actual cooktop into the kitchen. Undermount bowls, farm aprons, and cooktop cutouts are not interchangeable. A printout that does not match the unit in the box is a common way to cut the wrong hole. Faucet hole count and spacing come from the fixture, not from memory. If the units are not in Austin yet, wait. Waiting beats a recut.

Seams And Veins

Natural slabs have a length limit. Most larger L shapes and islands need a seam. We mark seam location with you based on slab size, strength, and the pattern you picked on the Austin floor. A seam over a dishwasher is generally a weak place. Vein flow across a corner is a choice, not a given. You see the plan before the saw starts.

Template Day On A Real Job

Template day is the measurement visit that happens after cabinets are installed and fastened in their final position. The crew does not measure from plans or from a cabinet order sheet. They measure the actual tops, walls, and openings in the room. Digital templating records the perimeter, the overhang, inside corners, and the spots where a sink, cooktop, or faucet will sit. Nothing about this visit invents extra work. It is the step that turns the slab you already picked on an Austin floor into pieces that fit this kitchen. If cabinets are not done, we do not template.

What must be finished first is simple and non negotiable. Base cabinets have to be set, leveled, and screwed to the wall and to each other. The countertop plane has to be the plane you will live with. End panels, filler strips, and tall cabinets that meet the stone have to be in place. Walls should be as they will remain, because a later drywall bump will change the backsplash line. The sink and cooktop should be on site so cutouts match the real units. If a fixture is not there, we can still template the opening only if you accept that a later model change can force a recut. Recuts are extra work and extra stone.

You pick the slab off a real Austin slab floor with 299 lots on the floor before this visit. That choice is not decorative. Vein direction, book matching, and where a seam can hide all depend on the actual piece. On template day we bring that decision into the room. The crew walks the layout with you: which edge gets the best flow, where a seam has to fall because a slab is only so long, and how the sink cutout will interrupt the pattern. Sink cutout and sink set are included in the fabrication work. We do not guess the sink. We measure it. Call (512) 297-7493 for a straight quote.

How Digital Templating Works

The crew arrives with a digital templater and a notebook for notes that the machine does not catch. They clear the cabinet tops. Anything sitting on the cabinets has to come off. They check that cabinets are fastened and that the run is reasonably level. A large twist in the cabinet line will show up in the stone as a lip or a gap at a seam. They shoot the perimeter, then they shoot inside corners, radius ends, and any bump out. They mark sink center, faucet holes, and cooktop cutout from the actual units on site. Digital files go back to the shop as the cut path.

Sink and cooktop on site is not a courtesy. Undermount sinks need the exact bowl size, the flange, and the faucet hole count. A farm sink needs the apron height and the reveal you want, proud, flush, or slightly recessed. Cooktops need the cutout from the maker, plus clearance to a wall or a raised bar. If you leave a cardboard box and a printout, we can work from that, but a printout that does not match the unit in the box is a common failure. Bring the real sink and the real cooktop. If they are not in Austin yet, wait to template. Waiting is better than cutting the wrong hole.

Seam and vein layout happens on the same visit or at the slab floor with photos from the template. Natural stone does not come in infinite length. A long L or a large island usually needs a seam. We show where the seam has to go based on slab size, cabinet joints, and strength. A seam over a dishwasher is generally a weak place. A seam through a busy vein can look like a break in the pattern. Quartz patterns are more repeatable. Marble and some quartzite show movement you either accept across a seam or you do not. You decide with the crew looking at the actual stone. Call (512) 297-7493 for a straight quote.

Tradeoffs You Should Know

Digital templating is accurate when the room is ready and wrong when it is not. If cabinets are still being adjusted, the file will lock a shape that will change. If a wall is not finished, a later layer of tile or a thicker backsplash can leave a gap at the stone. If you plan a full height backsplash from the same slab, we need that decision on template day so we reserve the extra material. Holding extra slab for splash is a tradeoff. You use more of the lot. You also lock that lot so it cannot go to someone else. There is no way to template a moving target.

Seams are the honest downside on most larger kitchens. A single slab run looks clean. Many kitchens are longer than one slab. We can often put a seam at a corner or at a change of direction. We cannot make a seam in the middle of a long straight island disappear. Color matched epoxy helps. It does not erase the joint. Granite is generally hard and heat tolerant but porous enough to want sealing. Quartz needs no sealing and is non porous, but can be damaged by direct heat and by long UV outdoors. Marble etches from lemon and vinegar regardless of sealing. Quartzite is very hard, though some slabs sold as quartzite are softer and behave more like marble.

Another tradeoff is time versus readiness. People want stone on the cabinets as soon as the boxes are set. If the sink is still on a truck or the cooktop model is still being chosen, templating early creates recut risk. Recutting a sink hole that is already polished is ugly work and can scrap a piece. We would rather wait until the fixtures are in the room. Dates come in writing with the quote. For a rental or a flip, we work with a slab selection and fabrication partner for rental grade and flip grade stone, so a rental does not have to pay for a showpiece slab. Call (512) 297-7493 for a straight quote.

How To Decide Layout And Seams

Deciding seams and veins is a field decision, not a catalog decision. Stand at the cabinets with the crew. Look at how light hits the run. If you picked a busy granite or a quartzite with a strong diagonal, you generally want the movement to travel along the main stretch, not to crash into a sink. If you picked a quieter quartz, seam location matters more for structure than for pattern. Book matching two slabs looks continuous only if both slabs came from the same block and were cut in sequence. Not every lot on the Austin floor is a book match pair. Ask before you commit to a single face.

Overhangs, radius corners, and raised bars all get locked on template day. A standard overhang past the cabinet door is common. A seating overhang on an island needs support. We will tell you if the span wants steel or corbels. That is not optional if the stone is marble or a softer slab sold as quartzite. Porcelain slabs can be thin and need a different support plan than three centimeter granite. Soapstone is generally softer and will take dings. Dolomite sits between marble and quartzite in many cases and can etch. Decide the edge profile before we leave. Changing an edge after the shop has started is a new fabrication pass.

How you decide to proceed is whether the cabinets are truly ready and whether you accept the seam map. If you cannot live with a seam on the island, you need a different layout, a different slab size, or a shorter island. That can mean a redesign of the cabinet run. It is better to hear that on template day than after the saw. Semi precious slabs and heavy movement stones make layout slower because every hole punches a hole in the picture. Quiet quartz is faster to agree on. Neither is better. They are different jobs. When you are ready, call (512) 297-7493 for a straight quote. Email is info@atxgraniteking.com. Reachable seven days a week.

How This Crew Starts A Job

Start by picking the actual slab off a real Austin slab floor. Stone comes from a direct importer slab floor in Austin with 299 lots on the floor. You see the piece, not a sample chip. Then we schedule template after cabinets are in. Posted service area is Austin, Pflugerville, Round Rock, Cedar Park, Leander, Georgetown, Hutto, Jarrell, Salado, Belton, Temple, Killeen, Harker Heights, and the I-35 corridor. One crew templates, fabricates, and installs start to finish. We do not hand the job to a second shop after measurement. That is the whole method.

On the phone we will ask if cabinets are installed, if the sink and cooktop are on site, and which stone you already picked. If you have not picked, we send you to the floor first. Templating a kitchen with no slab chosen wastes a trip because seam math depends on slab length. Bring photos of the cabinet run if you want a preliminary look. Photos are not a template. They only tell us if the job is in range. We give dates in writing with the quote. We do not give a verbal window and then disappear. Call (512) 297-7493 for a straight quote.

Have the room clear enough to work. Pets crated, kids not using the island as a desk, leftover cabinet boxes out of the way. We need access to every run, including a pantry pass through or a hallway bartop if those get stone. If a section is still waiting on a cabinet, we can template the finished parts only if you accept a second visit for the rest. A second visit is extra coordination. It is sometimes the honest path. After template, fabrication includes the sink cutout and sink set. Install is the same crew. Questions go to (512) 297-7493 or info@atxgraniteking.com seven days a week. Call for a straight quote.

Flat, honest pricing

Priced by the square foot.

StandardKitchens, baths, bars
$38per sq ft
Over 1,000 sq ftBuilders, multifamily, whole-house
$30per sq ft

$38 per square foot, cut, measure, and install included. Jobs over 1,000 square feet: $30 per square foot.

Sink cutout and sink set are included in the fabrication work. Non standard work is still quoted before work begins. Send the rough square footage and the rooms involved, or call (512) 297-7493 for a straight quote.

Good to know

Questions, answered.

What has to be done before you template?

Cabinets must be installed, leveled, and screwed to the wall and to each other. End panels, fillers, and any tall unit that meets the stone should be in place. The sink and cooktop should be on site. Walls should be close to final, because a later bump changes the back line. If we arrive and the boxes are still being moved, we will not shoot a file that we know will be wrong. Finish the cabinets first. Then call (512) 297-7493 for a straight quote.

Do I really need the sink in the house that day?

Yes if the cutout depends on that sink. Undermount sinks vary by bowl size and flange. Farm sinks vary by apron and reveal. Faucet holes are not a standard pattern. We can template from a manufacturer drawing, but drawings that do not match the unit in the box are a common failure. The honest downside is delay. If the sink is not in Austin, waiting is better than cutting a hole we have to patch or scrap. Sink cutout and sink set are included in the fabrication work once we have the real fixture.

Can you template without a seam on my island?

Only if one slab is long enough and wide enough for that island after overhangs and edge loss. Many islands are not. We will show you the math on the actual lot you picked on the Austin floor. Asking for no seam on a run that is longer than the slab is asking us to invent stone. We will not. Options are a shorter island, a different lot, or accepting a seam in the strongest, least obvious place. That limitation is real. Call (512) 297-7493 for a straight quote.

How long after template until you install?

We do not post a fixed number of days. Shop load, stone type, edge work, and whether you change the sink after the file is shot all move the calendar. Porcelain, marble, and busy book match layouts generally take more care in the shop than a simple quartz rectangle. The crew gives dates in writing with the quote. If something in the room changes after template, tell us before the saw. A silent change is how pieces come back wrong. Call (512) 297-7493 for a straight quote.

Can you template a rental kitchen the same way?

Yes, with a different stone path if you want it. We work with a slab selection and fabrication partner for rental grade and flip grade stone, so a rental does not have to pay for a showpiece slab. Template day is still the same work. Cabinets must be ready. Sink and cooktop should be on site. Seams still follow slab size. The difference is the lot you pick, not the measurement. Serves Austin, Pflugerville, Round Rock, Cedar Park, Leander, Georgetown, Hutto, Jarrell, Salado, Belton, Temple, Killeen, Harker Heights, and the corridor. Call for a straight quote.